' 新闻动态 - Dorland德兰系统控制
站内搜索
  • steute世德工业开关 中国办事处
    德国steute公司2009年4月授予北京德兰系统控制技术有限公司为中国区独家代理
  • steute世德工业开关 steute公司
    德国steute(世德)成立于1961年,作为机械、仪器以及设备工程领域的电子技术产品制造商而享有盛誉
  • steute世德工业开关 工业产品
    世德现拥有200余名员工,开发和生产各种应用于复杂、重要场合的开关设备,世德的业务范围包括各种控制设备的设计,例如脚踏或拉线开关、安全开关设备

您的位置:

德兰(中国)

»

新闻动态


新闻动态



3C申请流程

2009-4-2

Certification Application procedure Model
 
Type testing + Initial inspection of the factory + Follow-up inspection
Major processes for certification
  1.Application for certification
  2. Type testing
  3. Initial inspection of the factory
  4.Evaluation of certification results and approval of certification
      5.Follow-up inspection
Application for certification
In principle, application unit shall be defined according to different product families, models/types, specifications, working principles, constructions in terms of product safety, the components having significant influence on EMC performance.
 
In principle, the application shall be made according to application unit. The products, of same model/type, of same manufacturer, but from different manufacturing premises, shall be in different application units, but only one type testing is required.
 
Application documents
The formal application shall be submitted with the following documents:
1.Product assembly chart, circuit diagram
2.List of critical components and/or materials
3.Description of the difference between the different model/type of products in the same application unit.
4.Other necessary documents.
 
Type testing
The principles of sample delivery for type testing
The representative samples from the units of application for certification shall be selected and supplied for type testing. According to requirements, samples of other products covered by the application unit should be supplied for additional testing on differences
Test standards, items and methods for type testing
The test standards for certification are specified

Test items
1.Test items for safety
2.Test items for EMC
1)The type testing shall be carried out according to the methods specified and/or referred in the standards.
2)Initial inspection of the factory
Contents of the inspection; The contents of factory inspection shall include the factory quality assurance ability assessment and the products consistency check.
3)Timing of factory inspection:
The duration of factory inspection shall be determined by the amounts of application units of products to be certified and with the consideration of the scale of the factory. It will normally take about 1 to 4 man-day for each processing premises.
Evaluation of certification results and approval of certification
Follow-up inspection
 
CCC Certification (Briefing)
 
In December 2001, the State General Administration of Quality Supervision, Inspection and Quarantine of the People’s Republic of China issued the Regulations for Compulsory Product Certification.  The Compulsory Product Certification System began to replace the original Quality License System for Commodity Inspection and Safety Certification System for Electrical Equipment.
 
The abbreviation of China Compulsory Product Certification is CCC or 3C.  It is the statutory compulsory safety certification system and the basic approach to safeguard the consumers" rights and interests and protect the personal and property safety, which is adopted widely by international organizations.
 
China Compulsory Certification System came into force since May 1, 2002.  In accordance with the joint announcement No.38 [2003] by the State General Administration for Quality Supervision and Inspection and Quarantine of the People’s Republic of China and the Certification and Accreditation Administration of the People’s Republic of China, the time for implementing the supervision and management of the market for compulsory product certification was decided on August 1, 2003.
 
The Products subject to Compulsory Product Certification covers 135 products divided into 20 categories, including household appliances, motor vehicles, motorcycles, safety glasses, medical devices, lighting apparatus, cables and wires...etc.  CQC is appointed to undertake the work of compulsory product certification for 17 categories within the CCC catalogue.
 
Question: how long the application’s process?

Answer: Generally it will be within 1-3 months after a formal acceptance by CQC about the applicant, and will formally inform to applicant while resulted the process.
 
 




友情链接:佳木斯防爆认证所   中石油   中石化   中海油   工信部   科技部   中航技   CQC认监委   steute德国   国家发改委  

© 北京德兰系统控制技术有限公司版权所有.京ICP备05071969号-2位访问者

地址:北京市海淀区大钟寺华杰大厦11B5室 邮编:100098 E-Mail:info@dorland.com.cn
电话:010-62961317/62198496/62199672 传真:010-62985217 手机:13910650041